公司介绍s
Home > Case > Project > 450KW biogas generator set was installed on April of 2022 in a Thailand poultry farm

450KW biogas generator set was installed on April of 2022 in a Thailand poultry farm

Detailed Description

One unit of containerized 450KW bioGas Generator Set was installed on April of 2022 in a Thailand poultry farm. The biogas generator runs well in providing power for farm loads. 

Running mode: Working continuously in synchronization with PEA grid(24 hours/day, 7 days/week)





RELATED CASES

No search results found!

This website uses cookies to ensure you get the best experience on our website.

Accept Reject